{"id":22213,"date":"2021-11-23T12:57:04","date_gmt":"2021-11-23T10:57:04","guid":{"rendered":"https:\/\/www.sweco.fi\/?page_id=22213"},"modified":"2022-12-05T18:35:21","modified_gmt":"2022-12-05T16:35:21","slug":"bim","status":"publish","type":"page","link":"https:\/\/www.sweco.fi\/en\/services\/digitalization\/bim\/","title":{"rendered":"BIM Coordination"},"content":{"rendered":"<section class=\"block fwmb\" >\n\t<div class=\"block__inner editor-content fwmb__inner fwmb__inner--right fwmb__inner--image\">\n\n        <div class=\"fwmb__media col col-12\">\n\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1680\" height=\"560\" src=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/06\/Tietomallikoordinointi-1680x560.jpg\" class=\"attachment-fwmb-image size-fwmb-image\" alt=\"Tietomallikoordinointi\" \/>\t\t<\/div>\n\n        \n                    <div class=\"col col--5 col--md--11 fwmb__content  right\">\n                                <h1 class=\"h2\">BIM Coordination<\/h1>\n<p><span class=\"TextRun  BCX0 SCXW247430392\" lang=\"EN\" xml:lang=\"EN\" data-contrast=\"none\"><span class=\"NormalTextRun  BCX0 SCXW247430392\">Sweco utilizes building information modeling BIM, in all phases of a building\u2019s life cycle, from needs assessment to handover, use and maintenance. Design and commissioning are based on our own effective design methods that utilize LEAN principles and commissioning based on business information models.<\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n                            <\/div>\n        \n\t<\/div>\n<\/section>\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<p><span class=\"NormalTextRun  BCX0 SCXW247430392\">Our expertise ensures that the customers and end use<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">r<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">\u00a0goals are in-line,\u00a0<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">while meeting the quality and cost-effectiveness goals of the project.<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">\u00a0We are active in developing our\u00a0<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">expertise<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">\u00a0in design, modelling, simulations and virtual\u00a0<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">technologies<\/span><span class=\"NormalTextRun  BCX0 SCXW247430392\">.<\/span><\/p>\n<p><span data-contrast=\"none\">For us, information modelling is a tool to help in design, construction, use and maintenance. Our focus is on utilizing and distributing information models and the information within them for all disciplines through the whole life cycle of the project in hand.\u00a0Modelling enhances communication and seamless cooperation between the various parties involved in the construction process.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;201341983&quot;:0,&quot;335559739&quot;:375,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">We follow the\u00a0latest industry\u00a0guidelines\u00a0(e.g.\u00a0YTV 2012)\u00a0and standards. Our services enable the comprehensive utilization\u00a0of\u00a0data\u00a0in the various phases of the project.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;201341983&quot;:0,&quot;335559739&quot;:375,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<h4>BIM Coordination<\/h4>\n<p>Your project will be assisted by the best BIM coordinators in the field.<\/p>\n<p>During the needs assessment phase, the objectives of the project&#8217;s data modelling are defined, and the DATA model coordinator acts as the client&#8217;s expert in the project. The DATA Model Coordinator assists the subscriber in ordering a high-quality data model.<\/p>\n<p>During the project planning phase, a preliminary data modelling plan for the project will be defined and sufficient time will be ensured for the data modelling.<\/p>\n<p>During the preparatory phase of the design, a risk assessment of the data modelling will be prepared. The DATA Model Coordinator assists the subscriber in defining designer data modeling tasks.<\/p>\n<p>During the draft phase, our expert will investigate all modelling needs with the client and architect.<\/p>\n<p>During the implementation phase of the project, the DATA Model Coordinator collects, coordinates and verifies the data models of the different design parties.<\/p>\n<p>During the preparation phase of construction, the DATA Model Coordinator performs quality assurance tasks for data models and assists the client in selecting contractors. During the construction phase, he arranges a data model review, updates the DATA modelling plan and agrees on cooperation procedures for modelling.<\/p>\n<p>At the end of the project, the DATA model coordinator draws up a composite model of design or implementation models with reports and assists with the possibilities for utilising data models during the maintenance phase of the building.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n\n\n    <section class=\"block block--white contacts\" >\n        <div class=\"block__inner contacts__inner\">\n            <div class=\"col--11 col--wrapper col--stretch\">\n\t\t\t\t\t\t\t\t                    <div class=\"col col--3 person person--card\">\n                        <div class=\"person__inner\">\n\t\t\t\t\t\t\t                            <div class=\"person__content editor-content\">\n                                <p class=\"h4 hyphenate\">Antti H\u00e4m\u00e4l\u00e4inen<\/p>                                <em>Customer relationships and sales<\/em>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"person__contact\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<button class=\"btn btn__small btn__secondary contact-info-btn\" data_contact-id=\"15958\" data-email-subject=\"\">Show contact information<\/button>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t                            <\/div>\n                        <\/div>\n                    <\/div>\n\t\t\t\t                    <div class=\"col col--3 person person--card\">\n                        <div class=\"person__inner\">\n\t\t\t\t\t\t\t                            <div class=\"person__content editor-content\">\n                                <p class=\"h4 hyphenate\">Niko Vironen<\/p>                                <em>Product and Sales Manager, VDC Services<\/em>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"person__contact\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<button class=\"btn btn__small btn__secondary contact-info-btn\" data_contact-id=\"15956\" data-email-subject=\"\">Show contact information<\/button>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t                            <\/div>\n                        <\/div>\n                    <\/div>\n\t\t\t\t            <\/div>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":41,"featured_media":16725,"parent":21337,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"Our expertise ensures that the customers and end user\u00a0goals are in-line,\u00a0while meeting the quality and cost-effectiveness goals of the project.\u00a0We are active in developing our\u00a0expertise\u00a0in design, modelling, simulations and virtual\u00a0technologies.","_seopress_robots_index":"","footnotes":""},"class_list":["post-22213","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/pages\/22213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/users\/41"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/comments?post=22213"}],"version-history":[{"count":4,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/pages\/22213\/revisions"}],"predecessor-version":[{"id":38223,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/pages\/22213\/revisions\/38223"}],"up":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/pages\/21337"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media\/16725"}],"wp:attachment":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media?parent=22213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}