{"id":72830,"date":"2025-11-05T13:25:51","date_gmt":"2025-11-05T11:25:51","guid":{"rendered":"https:\/\/www.sweco.fi\/?p=72830"},"modified":"2025-11-05T13:34:24","modified_gmt":"2025-11-05T11:34:24","slug":"vantaa-energia-partners-with-sweco-for-electricity-storage-facility","status":"publish","type":"post","link":"https:\/\/www.sweco.fi\/en\/insight\/news\/vantaa-energia-partners-with-sweco-for-electricity-storage-facility\/","title":{"rendered":"Vantaa Energia partners with Sweco for electricity storage facility"},"content":{"rendered":"<section class=\"block fwmb\" >\n\t<div class=\"block__inner editor-content fwmb__inner fwmb__inner--right fwmb__inner--image\">\n\n        <div class=\"fwmb__media col col-12\">\n\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1680\" height=\"560\" src=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola.jpg\" class=\"attachment-fwmb-image size-fwmb-image\" alt=\"\" srcset=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola.jpg 1680w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-200x67.jpg 200w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-768x256.jpg 768w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-1536x512.jpg 1536w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-520x173.jpg 520w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-800x267.jpg 800w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-900x300.jpg 900w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-1350x450.jpg 1350w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/10\/Vantaan-Energian-sahkovarasto-Rekola-652x217.jpg 652w\" sizes=\"auto, (max-width: 1680px) 100vw, 1680px\" \/>\t\t<\/div>\n\n        \n        \n\t<\/div>\n<\/section>\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<h1>Vantaa Energia partners with Sweco for electricity storage facility<\/h1>\n<p>Ocotber 27, 2025<\/p>\n<p><b><span data-contrast=\"none\">The nearly 10-megawatt hour electricity storage facility in Rekola, Vantaa, will be implemented using the EPCM model. Sweco is responsible for the planning and management of the project. The procurement decisions are made by Vantaa Energy. The battery storage will be supplied by the Dutch company Alfen.\u00a0<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The electric battery plant is based on lithium-ion technology and has a discharge and charging capacity of almost 10 megawatts and a charging capacity of 10 megawatt-hours. The electric battery supports the stability of the electricity grid in rapid changes in demand or supply, and its strength is its excellent responsiveness.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">&#8220;The electricity storage facility is a good match for the 60-megawatt electric boiler currently being built in the Martinlaakso power plant area, which will produce district heat with renewable electricity from the end of the year,&#8221; says <\/span><b><span data-contrast=\"none\">Sami<\/span><\/b> <b><span data-contrast=\"none\">Lehtiniemi<\/span><\/b><span data-contrast=\"none\">, Vice President, Electricity Business at Vantaa Energy.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">&#8220;Electric battery storage facilities will play a key role in the energy systems of the future. They enable the efficient use of renewable energy and improve the stability of the electricity grid. Sweco has strong expertise and experience in the design and implementation of these innovative solutions, and it is great to be involved in the Rekola electricity storage project in Vantaa,&#8221; says <\/span><b><span data-contrast=\"none\">Tuomas Salminen,<\/span><\/b> <span data-contrast=\"auto\">Division Director, Industry and Energy, Sweco Finland.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<div class=\"buttons-wrapper buttons-wrapper--left\"><a href=\"https:\/\/www.sweco.fi\/en\/energy-storage-expert-services\/\" target=\"\" class=\"btn btn__primary \">Energy storage expert services<\/a><a href=\"https:\/\/www.sweco.fi\/en\/energy-storage-expert-services\/\" target=\"\" class=\"btn btn__primary \">Energy storage expert services<\/a><\/div>\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>The nearly 10-megawatt hour electricity storage facility in Rekola, Vantaa, will be implemented using the EPCM model. Sweco is responsible for the planning and management of the project.<\/p>\n","protected":false},"author":175,"featured_media":72822,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"Vantaa Energia partners with Sweco for electricity storage facility","_seopress_titles_desc":"The nearly 10-megawatt hour electricity storage facility in Rekola, Vantaa, will be implemented using the EPCM model. Sweco is responsible for the planning and management of the project.","_seopress_robots_index":"","footnotes":""},"categories":[139],"tags":[],"class_list":["post-72830","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/72830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/users\/175"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/comments?post=72830"}],"version-history":[{"count":4,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/72830\/revisions"}],"predecessor-version":[{"id":72836,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/72830\/revisions\/72836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media\/72822"}],"wp:attachment":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media?parent=72830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/categories?post=72830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/tags?post=72830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}