{"id":73876,"date":"2025-12-01T15:33:14","date_gmt":"2025-12-01T13:33:14","guid":{"rendered":"https:\/\/www.sweco.fi\/?p=73876"},"modified":"2025-12-01T15:33:14","modified_gmt":"2025-12-01T13:33:14","slug":"implementation-phase-of-the-vantaa-light-rail-begins-sweco-afry-and-wsp-to-continue-planning-eastern-section","status":"publish","type":"post","link":"https:\/\/www.sweco.fi\/en\/insight\/press-releases\/implementation-phase-of-the-vantaa-light-rail-begins-sweco-afry-and-wsp-to-continue-planning-eastern-section\/","title":{"rendered":"Implementation phase of the Vantaa light rail begins:\u00a0Sweco,\u00a0Afry\u00a0and\u00a0WSP to continue planning eastern section"},"content":{"rendered":"<section class=\"block fwmb\" >\n\t<div class=\"block__inner editor-content fwmb__inner fwmb__inner--right fwmb__inner--image\">\n\n        <div class=\"fwmb__media col col-12\">\n\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1680\" height=\"560\" src=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe.jpg\" class=\"attachment-fwmb-image size-fwmb-image\" alt=\"Havainnekuva Vantaan ratikasta Kielotiell\u00e4.\" srcset=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe.jpg 1680w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-200x67.jpg 200w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-768x256.jpg 768w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-1536x512.jpg 1536w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-520x173.jpg 520w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-800x267.jpg 800w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-900x300.jpg 900w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-1350x450.jpg 1350w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2025\/11\/Vantaan-ratikan-toteutusvaihe-652x217.jpg 652w\" sizes=\"auto, (max-width: 1680px) 100vw, 1680px\" \/>\t\t<\/div>\n\n        \n        \n\t<\/div>\n<\/section>\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<h1>Implementation phase of the Vantaa light rail begins: Sweco, Afry and WSP to continue planning eastern section<\/h1>\n<p><span data-contrast=\"auto\">Nov 27, 2025<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The Vantaa City Council has approved the revised project plan for the Vantaa light rail, and the implementation phase will begin on 1 December 2025. A consortium consisting of\u00a0Sweco,\u00a0AFRY,\u00a0and\u00a0WSP will continue planning during the implementation phase for the eastern section between\u00a0Kuninkaala\u00a0and\u00a0Mellunm\u00e4ki.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The implementation agreement was signed by the clients,\u00a0contractors\u00a0and design partners. The clients are the City of Vantaa, Helsinki Region Environmental Services Authority (HSY) and\u00a0P\u00e4\u00e4kaupunkiseudun\u00a0Kaupunkiliikenne\u00a0Oy (Metropolitan Area Transport Ltd). The contractors for the eastern section are GRK Suomi Oy and\u00a0Kreate\u00a0Oy.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The alliance will design and deliver Vantaa\u2019s first light rail line. The project is divided into western and eastern sections. In the eastern section, AFRY, WSP and\u00a0Sweco\u00a0are responsible for\u00a0planning related to the light rail, streets, bridges, municipal\u00a0engineering\u00a0and the environment, as well as for commissioning preparations.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<h2>Ongoing collaboration\u00a0continues<\/h2>\n<p><span data-contrast=\"auto\">The consortium has worked closely with the clients and contractors since the development phase, drawing on broad design\u00a0expertise\u00a0and experience from major urban development and light rail projects.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">&#8220;The implementation phase highlights our team&#8217;s extensive design expertise. Through close cooperation we have built a strong foundation for delivering the project. We have developed solutions that protect the valuable groundwater areas in Hakunila and Fazerila. In the implementation phase we will continue to consider environmental values and biodiversity \u2014 construction will be limited to a narrow corridor, helping maintain movement for people and wildlife for decades to come,&#8221; says <strong>Juho Siipo<\/strong>, Division Director, Infrastructure and Transportation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"auto\">Vantaa light rail in brief<\/span><\/i><br \/>\n<span data-contrast=\"auto\">The Vantaa light rail is the city&#8217;s first light rail system, making Vantaa the fourth tram\/light-rail city in Finland. The 19-kilometre east\u2013west connection runs from\u00a0Mellunm\u00e4ki\u00a0metro station via\u00a0Hakunila, Tikkurila and\u00a0Aviapolis\u00a0to Helsinki Airport. The light rail will\u00a0largely be\u00a0built within the existing street network, and street areas will be comprehensively upgraded in connection with the project.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The aim is to provide homes for 60,000 new residents and create 30,000 new jobs along the route by 2050. Construction is scheduled to begin in\u00a02025\u00a0and passenger service is planned to start in 2029.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"auto\">For\u00a0additional\u00a0information, please contact:<\/span><\/i><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559739&quot;:130,&quot;335559740&quot;:260,&quot;469777462&quot;:[0,567,1276,2552,3828,5103,6379,8364],&quot;469777927&quot;:[0,0,0,0,0,0,0,0],&quot;469777928&quot;:[0,0,0,0,0,0,0,0]}\"><br \/>\n<\/span>Juho Siipo, Division Director, Infrastructure and Transportation, Sweco Finland<br \/>\njuho.siipo@sweco.fi<\/p>\n<div class=\"buttons-wrapper buttons-wrapper--left\"><a href=\"https:\/\/www.sweco.fi\/en\/services\/infrastructure-and-traffic\/\" target=\"\" class=\"btn btn__primary \">Infrastructure and Traffic services at Sweco<\/a><\/div>\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>A consortium consisting of\u00a0Sweco,\u00a0AFRY,\u00a0and\u00a0WSP will continue planning during the implementation phase for the Vantaa light trail eastern section between\u00a0Kuninkaala\u00a0and\u00a0Mellunm\u00e4ki.\u00a0<\/p>\n","protected":false},"author":175,"featured_media":73875,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"Implementation phase of the Vantaa light rail begins:\u00a0Sweco,\u00a0Afry\u00a0and\u00a0WSP to continue planning eastern section","_seopress_titles_desc":"A consortium consisting of\u00a0Sweco,\u00a0AFRY,\u00a0and\u00a0WSP will continue planning during the implementation phase for the Vantaa light trail eastern section between\u00a0Kuninkaala\u00a0and\u00a0Mellunm\u00e4ki.\u00a0","_seopress_robots_index":"","footnotes":""},"categories":[96],"tags":[1170],"class_list":["post-73876","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases","tag-light-rail"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/73876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/users\/175"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/comments?post=73876"}],"version-history":[{"count":5,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/73876\/revisions"}],"predecessor-version":[{"id":73895,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/73876\/revisions\/73895"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media\/73875"}],"wp:attachment":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media?parent=73876"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/categories?post=73876"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/tags?post=73876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}