{"id":82827,"date":"2026-09-22T18:03:53","date_gmt":"2026-09-22T15:03:53","guid":{"rendered":"https:\/\/www.sweco.fi\/?p=82827"},"modified":"2026-11-11T18:07:44","modified_gmt":"2026-11-11T16:07:44","slug":"sweco-continues-to-support-ren-gas-tampere-e-methane-plant","status":"publish","type":"post","link":"https:\/\/www.sweco.fi\/en\/insight\/press-releases\/sweco-continues-to-support-ren-gas-tampere-e-methane-plant\/","title":{"rendered":"Sweco continues to support Ren-Gas\u2019 Tampere e-methane plant"},"content":{"rendered":"<section class=\"block fwmb\" >\n\t<div class=\"block__inner editor-content fwmb__inner fwmb__inner--right fwmb__inner--image\">\n\n        <div class=\"fwmb__media col col-12\">\n\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1680\" height=\"560\" src=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web.jpg\" class=\"attachment-fwmb-image size-fwmb-image\" alt=\"Havainnekuva Ren-Gasin tehtaasta ilmasta kuvattuna.\" srcset=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web.jpg 1680w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-200x67.jpg 200w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-768x256.jpg 768w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-1536x512.jpg 1536w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-520x173.jpg 520w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-800x267.jpg 800w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-900x300.jpg 900w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-1350x450.jpg 1350w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2026\/09\/Ren-Gas_web-652x217.jpg 652w\" sizes=\"auto, (max-width: 1680px) 100vw, 1680px\" \/>\t\t<\/div>\n\n        \n        \n\t<\/div>\n<\/section>\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<h1>Sweco continues to support Ren-Gas\u2019 Tampere e-methane plant<\/h1>\n<p>September 22, 2026<\/p>\n<p><strong>Ren-Gas has selected the key technology suppliers for its Tampere e-methane plant. As Ren-Gas\u2019 EPCM partner, Sweco will lead the overall design, procurement and construction of the facility, while also being responsible for integrating the plant\u2019s technologies.<\/strong><\/p>\n<p>As EPCM partner, Sweco will ensure execution of the plant\u2019s detailed design phase. Its responsibilities include integrating the systems of various technology partners, managing the necessary procurement packages, and carrying out site-related duties. Sweco has been involved in the project since the preliminary design phase.<\/p>\n<p>The plant combines hydrogen production, biogenic carbon dioxide capture, synthetic methane production, and heat recovery into a single integrated energy system. It has been designed to operate flexibly, enabling production to adapt to the availability of electricity generated from renewable sources while meeting the strict requirements for RFNBO fuels.<\/p>\n<p>\u201cEurope\u2019s energy transition needs new industrial value chains. With the Tampere project, we are bringing together Europe\u2019s leading technology suppliers to build synthetic methane production at industrial scale. At the same time, we want to demonstrate that European expertise can deliver a complete RFNBO fuel value chain, from hydrogen all the way to the finished product\u201d, says <strong>Saara Kujala,<\/strong> CEO at Nordic Ren-Gas.<\/p>\n<p>\u201cIt is exciting to continue our collaboration on a project that is among Finland\u2019s pioneers in renewable e-methane production. Our strength lies in managing and leading complex projects, and together with the various technology suppliers, we will ensure a safe, efficient and fully functional production facility. Success in energy projects of this scale is built on effective management of the overall project,\u201d says <strong>Tuomas Salminen<\/strong>, Division Director, Industry and Energy, Sweco.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Inquiries:<\/strong><\/p>\n<p>Tuomas Salminen, Division Director, Industry and Energy, Sweco tel +358 400 819 547, <u>tuomas.salminen@sweco.fi<\/u><br \/>\nTiina Varhee, media contact, Sweco, tel. +358 40 723 1231, <u>ext.tiina.varhee@sweco.fi<\/u><\/p>\n<div class=\"buttons-wrapper buttons-wrapper--left\"><a href=\"https:\/\/www.sweco.fi\/vastuullisuuskonsultointi\/energia-alan-strateginen-asiantuntijakumppani-energiamurroksessa\/\"  class=\"btn btn__primary \">Energia-alan strateginen asiantuntijakumppani energiamurroksessa<\/a><\/div>\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>As Ren-Gas\u2019 EPCM partner, Sweco will lead the overall design, procurement and construction of the facility, while also being responsible for integrating the plant\u2019s technologies.<\/p>\n","protected":false},"author":175,"featured_media":82826,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"Sweco continues to support Ren-Gas\u2019 Tampere e-methane plant","_seopress_titles_desc":"As Ren-Gas\u2019 EPCM partner, Sweco will lead the overall design, procurement and construction of the facility.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[96],"tags":[],"class_list":["post-82827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/82827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/users\/175"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/comments?post=82827"}],"version-history":[{"count":1,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/82827\/revisions"}],"predecessor-version":[{"id":82828,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/posts\/82827\/revisions\/82828"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media\/82826"}],"wp:attachment":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media?parent=82827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/categories?post=82827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/tags?post=82827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}