{"id":14691,"date":"2021-05-09T10:28:00","date_gmt":"2021-05-09T07:28:00","guid":{"rendered":"https:\/\/www.sweco.fi\/?post_type=showroom_cpt&#038;p=14691"},"modified":"2022-12-05T18:35:32","modified_gmt":"2022-12-05T16:35:32","slug":"swecos-experts-in-pori-natural-gas-pipeline-project","status":"publish","type":"showroom_cpt","link":"https:\/\/www.sweco.fi\/en\/projects\/swecos-experts-in-pori-natural-gas-pipeline-project\/","title":{"rendered":"Sweco\u2019s experts in Pori natural gas pipeline project"},"content":{"rendered":"<section class=\"block showroom-intro \" >\n\t<div class=\"showroom-intro__top\">\n\t\t<img width=\"1580\" height=\"479\" src=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480.jpg\" class=\"showroom-intro__bg-img\" alt=\"Porin maakaasuputki\" fetchpriority=\"high\" decoding=\"async\" sizes=\"(max-width: 767px) 1080px, 1920px\" srcset=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480.jpg 1580w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480-200x61.jpg 200w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480-768x233.jpg 768w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480-1536x466.jpg 1536w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480-520x158.jpg 520w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480-800x243.jpg 800w, https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/porin_maakaasuputki_header_1580_480-990x300.jpg 990w\" \/>\t\t\t\t<div class=\"block__inner vacancy-intro__inner\">\n\t\t\t<div class=\"col--11 col--wrapper\">\n\t\t\t\t<div class=\"editor-content editor-content--white col--6 vacancy-intro__content\">\n\t\t\t\t\t<h1 class=\"h1 hyphenate\">Sweco\u2019s experts in Pori natural gas pipeline project<\/h1>\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<\/div>\n\n\t\t\n\t\t<div class=\"showroom-intro__meta\">\n\t\t\t\t\t\t<div class=\"showroom-intro__data\">\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Project<\/em>\t\t\t\t\t<p>Pori natural gas pipeline project<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Year<\/em>\t\t\t\t\t<p>2016<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\n<\/section>\n\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<p>The natural gas supply pipe has been built from the LNG terminal in Tahkoluoto, Pori, all the way to the Kaanaa area in Pori. The pipe distributes natural gas for the area\u2019s industrial plants. The LNG terminal is the first of its kind in Finland. The pipe was completed in spring 2016.<\/p>\n<p>The LNG supply pipe is made of PE plastic (PE100) and the size of the pipe is PE 355 (outer diameter 355 mm). The supply pipe\u2019s maximum operating pressure is 8 bar of excess pressure. The developer of the supply pipe and the related pressure reduction devices is Skangass Oy, which owns the pipes and is in charge of their use.<\/p>\n<p>The project utilised comprehensively Sweco\u2019s multidisciplinary expertise. We were in charge of the design, geotechnics, land measurements and ground investigations of the pipe and the project\u2019s civil engineering. As the principal designer of the project, we were in charge of the pressure reduction stations, for example, and we were also responsible for the project\u2019s structural engineering.<\/p>\n\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":5690,"template":"","showroom_cats":[156,161],"showroom_expertise":[],"showroom_partners":[],"showroom_location":[],"showroom_client":[],"class_list":["post-14691","showroom_cpt","type-showroom_cpt","status-publish","has-post-thumbnail","hentry","showroom_cats-industry-energy-and-environment","showroom_cats-environment-and-nature"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_cpt\/14691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_cpt"}],"about":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/types\/showroom_cpt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media\/5690"}],"wp:attachment":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media?parent=14691"}],"wp:term":[{"taxonomy":"showroom_cats","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_cats?post=14691"},{"taxonomy":"showroom_expertise","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_expertise?post=14691"},{"taxonomy":"showroom_partners","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_partners?post=14691"},{"taxonomy":"showroom_location","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_location?post=14691"},{"taxonomy":"showroom_client","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_client?post=14691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}