{"id":17093,"date":"2021-05-29T14:57:00","date_gmt":"2021-05-29T11:57:00","guid":{"rendered":"https:\/\/www.sweco.fi\/?post_type=showroom_cpt&#038;p=17093"},"modified":"2022-12-05T18:35:29","modified_gmt":"2022-12-05T16:35:29","slug":"grand-hansa-2","status":"publish","type":"showroom_cpt","link":"https:\/\/www.sweco.fi\/en\/projects\/grand-hansa-2\/","title":{"rendered":"Grand Hansa"},"content":{"rendered":"<section class=\"block showroom-intro \" >\n\t<div class=\"showroom-intro__top\">\n\t\t<img width=\"1680\" height=\"800\" src=\"https:\/\/www.sweco.fi\/wp-content\/uploads\/sites\/7\/2021\/05\/ASH_Grandhansa_sisaankaynti_kesa-1680x800.jpg\" class=\"showroom-intro__bg-img\" alt=\"Grand Hansa\" fetchpriority=\"high\" decoding=\"async\" sizes=\"(max-width: 767px) 1080px, 1920px\" \/>\t\t\t\t<div class=\"block__inner vacancy-intro__inner\">\n\t\t\t<div class=\"col--11 col--wrapper\">\n\t\t\t\t<div class=\"editor-content editor-content--white col--6 vacancy-intro__content\">\n\t\t\t\t\t<h1 class=\"h1 hyphenate\">Hotel Seurahuone renovated into a luxury hotel with the help of information modelling<\/h1>\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t<\/div>\n\n\t\t\n\t\t<div class=\"showroom-intro__meta\">\n\t\t\t\t\t\t<div class=\"showroom-intro__data\">\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Project<\/em>\t\t\t\t\t<p>Hotel Grand Hansa renovation<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Project Developer<\/em>\t\t\t\t\t<p>Sweco PM Oy<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Commission<\/em>\t\t\t\t\t<p>Construction and BIM coordination<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Client<\/em>\t\t\t\t\t<p>Ylva Group<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Schedule<\/em>\t\t\t\t\t<p>2019-2022<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"showroom-intro__item editor-content\">\n\t\t\t\t\t<em>Gross area<\/em>\t\t\t\t\t<p>15 000 m\u00b2<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\n<\/section>\n\n\n\n\n<section class=\"block cb block--white\" >\n\t<div class=\"block__inner cb__inner cb__inner--one\">\n\t<div class=\"col--12 col--center col--wrapper\">\n\t\t<div class=\"col col--6 editor-content\">\n\t\t\t<h2>Hotel Seurahuone renovated into a luxury hotel with the help of information modelling<\/h2>\n<p>The building complex consisting of Hotel Seurahuone, the Old and New Student House and the Hansatalo building is one of the best known landmarks in central Helsinki.\u00a0Sweco\u2019s BIM coordinators are guiding the renovation of the valuable property into a new luxury hotel, Hotel Grand Hansa.\u00a0The information model will also be utilised during the use and maintenance of the property.<\/p>\n<p>Ylva, the company that manages the properties of the Student Union of the University of Helsinki, owns the Seurahuone property built in 1912. It will soon form a part of the first luxury hotel of the Hyatt chain in the Nordic countries. In late 2022, Helsinki will receive a new five-star hotel in a prime location at the corner of Mannerheimintie and Kaivokatu.<\/p>\n<p>In addition to Hotel Seurahuone, Hotel Grand Hansa will include parts of the New Student House. Extensive demolitions will be carried out in both buildings. \u201cThe most significant changes to the facilities are caused by the construction of 224 new hotel rooms, as cramped offices and old hotel rooms are turned into airy and luxurious spaces,\u201d explains Ylva\u2019s Construction Manager\u00a0<strong>Verneri Lehtovirta<\/strong>.<\/p>\n<p>The most challenging technical task is to heighten the Hansatalo building into the most modern part of the hotel with a glass facade. The dome of the Student House will house a champagne bar and a winter garden will be located in the middle of the property. Luxurious spa and sauna facilities and a five-star gym, appropriate for a five-star hotel, are to be located in the basement. Despite all these changes, many things will remain as they are.<\/p>\n<p>\u201cThe late Art Nouveau building of Hotel Seurahuone is protected by the city plan\u2019s SR-1 class, meaning that the facade will not be touched,\u201d Lehtovirta says. \u201cIn cooperation with the Helsinki City Museum, we will also protect many valuable interiors, such as lobbies, staircases and offices.\u201d<\/p>\n<h3 class=\"h4\">Initial data of the historical site received through laser scanning<\/h3>\n<p>The valuable old property was an exceptionally complex site, in terms of demolitions alone. The level of measuring and modelling had to be defined accurately.<\/p>\n<p>\u201cThe first critical point of BIM coordination was the drafting of the measuring programme and then deciding on the features to be modelled,\u201d Lehtovirta says. Information modelling allowed us to see the whole and fill the gaps in the initial data. \u201cThere were many repairs performed by tenants, which made information control challenging.\u201d<\/p>\n<p>The property complex was laser scanned before and after demolition, as the accuracy of drawings required a great deal of specification. \u201cFloor plans could be off by dozens of centimetres,\u201d explains Sweco\u2019s BIM Coordinator\u00a0<strong>Juuso Erkkil\u00e4<\/strong>. \u201cLaser scanning provided accurate initial data on building locations and the thicknesses of different structures, for example.\u201d<\/p>\n<p>Lehtovirta feels that the BIM coordinator had an important role in the contractor procurement and design coordination. \u201cThe buildings will receive new technology and lift shafts, meaning that one of the BIM coordinator\u2019s key tasks is to ensure uncontradicted, high-quality designs,\u201d Lehtovirta emphasises.<\/p>\n<h3 class=\"h4\">Same BIM available to all in the cloud<\/h3>\n<p>The project will implement an ambitious practice, where separate designers and architects will work with the same BIM through a cloud service.<\/p>\n<p>\u201cRamboll will update the BIM of Arkkitehdit Soini &amp; Horto Oy in the cloud until the existing structures have been examined as accurately as possible,\u201d Erkkil\u00e4 explains. \u201cThis is the first Finnish construction project that works with a single up-to-date BIM that can be modified from different locations.\u201d<\/p>\n<p>During the project, the BIM is used to illustrate design solutions to different parties. \u201cThe virtual model allows us to examine solutions together with the user, the property owner and the authorities. The visualisation also helps with internal discussions,\u201d Lehtovirta says.<\/p>\n<p>The information model will be specified even further so that it can be utilised during the use and maintenance of the hotel. \u201cThe designers have received accurate requirements so that the information can be refined and the model used for maintenance purposes in the future,\u201d Erkkil\u00e4 says.<\/p>\n<blockquote>\n<figure><i class=\"icon icon-quote\"><\/i><\/figure>\n<p>The first critical point of BIM coordination was the drafting of the measuring programme.\u201d<br \/>\n\u2013 Verneri Lehtovirta, Ylva<\/p><\/blockquote>\n<blockquote>\n<figure><i class=\"icon icon-quote\"><\/i><\/figure>\n<p>\u201cInformation modelling allowed us to see the whole and fill the gaps in the initial data.\u201d<br \/>\n\u2013 Verneri Lehtovirta, Ylva<\/p><\/blockquote>\n<blockquote>\n<figure><i class=\"icon icon-quote\"><\/i><\/figure>\n<p>\u201cThe key thing in BIM coordination is to ensure uncontradicted, high-quality designs.\u201d<br \/>\n\u2013 Verneri Lehtovirta, Ylva<\/p><\/blockquote>\n<blockquote>\n<figure><i class=\"icon icon-quote\"><\/i><\/figure>\n<p>\u201cThe virtual model allows us to examine solutions together with the user, the property owner and the authorities. The visualisation also helps with internal discussions.\u201d<br \/>\n\u2013 Verneri Lehtovirta, Ylva<\/p><\/blockquote>\n\t\t<\/div>\n\t<\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Sweco\u2019s BIM coordinators are guiding the renovation of the valuable property into a new luxury hotel, Hotel Grand Hansa.\u00a0The information model will also be utilised during the use and maintenance of the property.<\/p>\n","protected":false},"featured_media":9812,"template":"","showroom_cats":[162,163,169,172],"showroom_expertise":[],"showroom_partners":[],"showroom_location":[],"showroom_client":[],"class_list":["post-17093","showroom_cpt","type-showroom_cpt","status-publish","has-post-thumbnail","hentry","showroom_cats-energy","showroom_cats-buildings-and-urban-areas","showroom_cats-tourism-and-hotels","showroom_cats-digitalization"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_cpt\/17093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_cpt"}],"about":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/types\/showroom_cpt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media\/9812"}],"wp:attachment":[{"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/media?parent=17093"}],"wp:term":[{"taxonomy":"showroom_cats","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_cats?post=17093"},{"taxonomy":"showroom_expertise","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_expertise?post=17093"},{"taxonomy":"showroom_partners","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_partners?post=17093"},{"taxonomy":"showroom_location","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_location?post=17093"},{"taxonomy":"showroom_client","embeddable":true,"href":"https:\/\/www.sweco.fi\/en\/wp-json\/wp\/v2\/showroom_client?post=17093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}