Data center water management
Data center water management services – water consumption, stormwaters and impacts on water bodies
Data center water management means taking an integrated approach to the availability, use and treatment of water, water supply and sewerage, cooling water, stormwater and construction-site waters, and impacts on water bodies. Water management is an essential part of data center planning, permitting, construction and operation. Sweco helps align solutions with regulation, local conditions and the data center’s technical requirements.
Data centers require a wide range of water infrastructure and comprehensive water management services. Sweco’s water experts help ensure the availability of process water, cooling water and fire water, as well as compliant potable water, sewerage and stormwater solutions.
We support data center operators and hosting municipalities in all water-management matters, starting with assessments of impacts on water bodies and stormwater studies. Sweco also has longstanding expertise in industrial EIA and permitting processes and support related to water legislation.
Data center water consumption and use
Data center water consumption and use
Data center water consumption is influenced above all by cooling solutions, as well as by the scale and location of the facility. If water cooling or cooling towers are selected instead of air cooling, water consumption may become one of the most important environmental considerations. In a closed-loop water system, however, consumption can be considerably lower.
Our water management and water-environment experts determine how much water the data center requires and where it can be sourced. We also assess the thermal and quality loads of discharged water on local water bodies. Where necessary, we draw on Sweco’s chemical-safety expertise.
In addition to cooling solutions, data center water consumption can be influenced through choices concerning water infrastructure. We can assess the suitability of alternative water sources and water recycling and reuse solutions for cooling, irrigation or other uses. Options may also include treated rainwater and meltwater.

Assessing data center impacts on water bodies
Data center water management in Finland is governed by a range of legislation. A data center project may be subject to several environmental and water-protection provisions used to assess, prevent and limit adverse impacts on water bodies and the wider environment during both construction and operation. For example, an environmental impact assessment, i.e. EIA procedure, often requires an assessment of impacts on water bodies, examining project-specific effects on surface water, groundwater, runoff and water use.
A data center project may require a permit under the Finnish Water Act if it affects the local water environment, such as water levels or flows in nearby water bodies or groundwater conditions. The need for a permit is always assessed on a project-specific basis.
During construction, particular attention is paid to construction-site water management. During operation, the focus shifts to water-use and cooling solutions and the organisation of water services.
We help account for Finnish legislation during the construction and operation of a data center and select design solutions that prevent loading of water bodies.

Water management design for data centers
A data center’s water management should be planned as an integrated whole as early as possible. Technical implementation is influenced by factors such as the capacity of the local water network, the selected water-abstraction solutions and the need for process water, firewater and potable water. Wastewater and construction-site water treatment also require careful planning.
Properly designed water infrastructure supports data center permitting, construction and operation, as well as environmental risk management. Sweco’s experts also provide contractual expertise, facilitating cooperation with the water utility.
Data center stormwater management and flood-risk preparedness
“Stormwater management for a data center site should be planned before the first earthworks begin. When the entire catchment, natural flow routes and construction-phase risks are considered early, stormwater solutions support both smooth project delivery and environmental risk management.”
Salla Hostikka, Team Manager, Stormwater, Sweco
The extensive built and impermeable surfaces of data center sites increase the volume of stormwater that must be managed. Stormwater management should therefore be addressed when planning the data center’s location, land use and regional infrastructure.
The impacts on stormwater can be significant from the very beginning of construction. Tree felling and topsoil removal reduce the natural infiltration of stormwater into the soil and create loose soil material that is washed into receiving water bodies during rainfall. This can cause significant turbidity and harm aquatic organisms.
A stormwater assessment and stormwater management plan may be required at the EIA stage and no later than the building-permit stage. Stormwater management plans are refined as the project progresses in accordance with authority and permit requirements. Impacts on water bodies and runoff identified in the EIA procedure should be considered in stormwater management, already during preparatory phases before construction, including earthworks. The earlier stormwater management planning begins, the more smoothly the permitting, design and construction process can proceed.
We design stormwater solutions based on local conditions and the natural flow routes of the entire catchment. The solutions manage stormwater quantity and quality, prevent flood risks and provide resilience against heavy rainfall and exceptional situations. Fuel and chemical handling areas can, where necessary, use oil separation, shut-off systems and other solutions that prevent pollutants from spreading and reduce risks to water bodies.
Stormwater assessments and management plans support permitting, construction and safe operation. During construction, the focus is on managing construction-site water, monitoring its quality and providing any necessary treatment before discharge. Technical and nature-based solutions can also delay, infiltrate and utilise stormwater as part of the site’s infrastructure and landscape design.
Do you need support in planning water management for a data center project?
We help identify the project’s impacts on water bodies, water-service needs and stormwater-management solutions suited to local conditions.
Frequently asked questions about data center water management
Data center water management covers water availability and consumption, water supply and sewerage, cooling water, stormwater and construction-site water management, and impacts on surface water and groundwater from project planning through to operation.
Water may be required for cooling, fire-suppression systems, domestic use, maintenance and other technical purposes. Demand depends particularly on the size of the data center and the selected cooling solution.
In Finland, most water consumption at data centers is attributable to the people working at the facilities. If a data center requires process water, consumption varies according to the cooling solution, facility size, utilisation rate and location. Evaporative solutions can increase consumption, whereas consumption may be lower in a closed-loop water system.
Water consumption can be influenced through cooling solutions, consumption monitoring, recycling and reuse. The suitability of treated rainwater and meltwater can also be assessed on a project-specific basis.
Stormwater management is designed based on catchment, flow routes, soil and local conditions. Stormwater can be delayed, infiltrated, treated, stored or utilised through technical and nature-based solutions.
Water management should be considered as early as the location and land-use planning stages. Measures are also needed before actual construction during tree felling, site clearance and earthworks. Effective management can significantly prevent adverse impacts on water bodies and aquatic organisms.
Contact us!
Antti-Jussi Laine
Data Centre Business LeadAntti Ryynänen
Business Director, Water and Energy NetworksSalla Hostikka
Storm WaterJanne Tolonen
Team Manager, Aquatic environment