Skip to content
Hand touching solar panel at sunset, renewable energy and clean power concept.

Energy efficiency directives are changing requirements for buildings and organisations

Prepare for requirements being updated in 2026

Legislative status updated on 22 October 2026. The national implementation of the EPBD is still partly under way, so details may change.

The EU’s revised energy efficiency directives affect building design, property development and the obligations of companies with high energy consumption.

The revised Energy Efficiency Act implementing the Energy Efficiency Directive (EED) entered into force in Finland at the beginning of 2026. As a result, companies’ obligations relating to energy audits and energy management systems are now determined more strongly by energy consumption.

The national implementation of the Energy Performance of Buildings Directive (EPBD) is progressing in stages. Some regulations have already been issued, while some legislative amendments are under parliamentary consideration and some decrees are still being prepared. The changes concern, among other things, new construction and renovation projects, energy performance certificates and E-number calculations, solar energy, and the energy efficiency of existing non-residential buildings.

At Sweco, we help you identify which requirements apply to your organisation, building portfolio and upcoming projects—and turn these obligations into a practical roadmap.

Energy Efficiency Directives

The Energy Efficiency Directive and the Energy Performance of Buildings Directive will require energy savings and improvements in the energy efficiency of buildings throughout the EU in the coming years.

Energy Efficiency Directive (EED): energy consumption determines companies’ obligations

The revised Energy Efficiency Act entered into force on 1 January 2026. A significant change is that companies’ obligations concerning energy audits and energy management systems are now based primarily on energy consumption rather than company size.

  1. A company whose average annual final energy consumption over the preceding three calendar years exceeds 2,700 MWh must conduct a statutory energy audit.
  2. Companies that became subject to the energy-audit obligation for the first time on the basis of their energy consumption had to complete their first audit by 11 October 2026.
  3. Companies previously subject to the energy-audit obligation will continue to conduct audits according to their existing schedule, at least every four years.
  4. If average annual final energy consumption exceeds 23,600 MWh, the company must implement a certified energy management system by 11 October 2027.
  5. Companies must notify the Energy Authority of exceeding the energy-consumption threshold in the manner provided by law.

The public sector must take energy efficiency into account more systematically in energy use, procurement and investments.

Check your company’s obligations

Determine your company’s final energy consumption for the previous three calendar years and assess whether the law requires an energy audit or a certified energy management system. Under certain conditions, the obligation may also be fulfilled at group level.

Energy Performance of Buildings Directive (EPBD): national regulation is becoming more specific

National implementation of the EPBD consists of several legislative and regulatory changes. Some implementation-related decrees have already been issued.

In October 2026, key government proposals concerning the energy efficiency of buildings and energy performance certificates are under parliamentary consideration, while amendments to some decrees are still being prepared. The final requirements and entry-into-force dates of unfinished changes will be clarified as legislative drafting progresses.

Based on the changes under preparation:

  1. New public buildings must be zero-emission buildings from 2028 onwards.
  2. The corresponding requirement for other new buildings will apply from 2030 onwards.
  3. Energy calculations for new buildings and energy-carrier coefficients will change.
  4. New assessment and reporting requirements will be added to energy reports.
  5. Managing summer thermal conditions will become more important.
  6. Energy performance certificates and energy classes will be revised.
  7. A voluntary renovation passport linked to the energy performance certificate will be introduced.
  8. Existing non-residential buildings will be subject to minimum energy-performance requirements.
  9. Requirements concerning solar energy, charging infrastructure, building automation and bicycle parking will be expanded.

Energy calculations and performance requirements for new construction are changing

In the future, new buildings must meet the requirements for zero-emission buildings (ZEBs). In Finland, the energy-efficiency level is intended to be demonstrated, among other things, by a new A0 energy class and other requirements set for zero-emission buildings.

The change in the level of requirements cannot be assessed solely on the basis of E-number limits, as energy-carrier coefficients, calculation weather data and other input data will also change. According to preparatory material, energy-carrier coefficients will decrease by approximately 25%, reducing calculated E-numbers. Consequently, the practical tightening of requirements will vary according to building type and energy solution.

In addition to current assessments, the new energy report would include, among other things:

  1. greenhouse gas emissions during use;
  2. indicators for renewable and emission-free energy;
  3. thermal conditions during the heating season; and
  4. assessments of daylight and solar-energy potential.

Summer temperature assessments will become stricter, particularly in new apartment buildings. This highlights the need to coordinate the building’s orientation, windows, solar shading, ventilation and possible cooling from the very beginning of the project.

These changes are related to the implementation of the EU Energy Efficiency Directive in Finland.

Renovation and alteration work

For renovation and alteration work, energy-efficiency requirements may still be met either on a building-component basis or by improving the building’s E-number to the required level. Renovated and replaced technical systems will also be subject to their own minimum requirements.

The percentage requirement for improvements based on the E-number will remain similar to the current level. The combined impact of phased renovations can be taken into account, and the voluntary renovation passport supports long-term renovation planning.

Applicable requirements are always determined by the property and the extent of the renovation.

Solar-energy requirements will expand in stages

Obligations concerning solar energy will gradually extend to new buildings, public buildings and certain existing non-residential buildings. In existing buildings, the obligation may be linked to large-scale renovations requiring a construction permit, roof work, or the installation of technical systems.

The requirements take account of technical, economic and functional feasibility. The potential for solar energy, as well as space reservations for roofs, façades, electrical systems and parking areas, should be assessed already during project planning.

No general obligation to retrofit solar energy has been proposed for existing residential buildings.

Owners of existing non-residential buildings

The Energy Performance of Buildings Act currently under preparation would introduce minimum requirements for office, commercial, accommodation, educational and hospital buildings, as well as sports halls.

The requirements are intended to be introduced in stages in 2030 and 2033, primarily targeting the least energy-efficient part of the building stock. Compliance would be assessed using the E-number and the energy performance certificate.

Building owners should:

  1. identify buildings that may fall within the scope of the requirements;
  2. ensure that energy performance certificates are up to date;
  3. determine the buildings’ current E-numbers;
  4. assess technically and economically suitable improvement measures;
  5. integrate measures into long-term maintenance and investment planning; and
  6. schedule improvements, where possible, in connection with other renovations.

Owners and developers of residential buildings

Owners and developers of residential buildings

No building-specific minimum energy-performance limits have been proposed for existing residential buildings in the same way as for non-residential buildings. Energy efficiency will be promoted through average targets for the building stock and requirements for renovation construction.

In new and extensively renovated residential buildings, requirements may concern, among other things:

  1. building automation and monitoring of technical systems;
  2. electric-vehicle charging infrastructure;
  3. bicycle spaces;
  4. solar energy; and
  5. management of summer thermal conditions.

According to the requirements under preparation, new and extensively renovated residential buildings with more than three parking spaces would be subject to broader charging-infrastructure requirements than at present. Requirements for the monitoring, control and interoperability of technical systems would also expand.

We help you prepare for energy-efficiency-directive requirements

Our services include:

  1. Obligation assessments: which EED and EPBD requirements apply to your organisation and buildings?
  2. Building portfolio classification, including E-numbers, energy-efficiency classes, technical systems and renovation needs
  3. Corporate energy audits and energy management systems
  4. EPBD impact assessments for new-build and renovation projects
  5. Simulation and management of summer thermal conditions
  6. Technical and financial solar-energy studies
  7. Planning of charging infrastructure and building automation
  8. Long-term maintenance and investment programmes for building portfolios
  9. Energy performance certificates, renovation passports and climate assessments

Would you like to ensure that your organisation meets changing energy-efficiency requirements?

Contact our experts and we will assess your situation and help you identify the best solutions.

Oskari Loikkanen

Expert, Sustainability Services

Jesse Kantola

Team Manager

Contact U!

  • This field is for validation purposes and should be left unchanged.