P2X – Competitiveness from renewable energy

P2X – Competitiveness from renewable energy

P2X (power-to-X) offers businesses the opportunity to combine achieving climate goals with sustainable business growth. Sweco is a comprehensive partner for P2X projects, combining deep technical expertise, strong regulatory and permitting processes management, and extensive experience with demanding industrial and energy infrastructure projects.

Our P2X Services

Sweco offers a full range of services for P2X projects, from preliminary planning to design services for an operational plant. We help ensure the profitability, technical viability, and regulatory compliance of your project right from the start.

1. Preliminary Planning and Technical Consulting

1. Preliminary Planning and Technical Consulting

With preliminary planning and technical consulting, we ensure the project is technically and economically feasible.

  • Process concept planning
  • Investment profitability assessments
  • Preliminary and basic design
  • CAPEX and OPEX calculations
  • Permitting services and environmental impact assessment (EIA)
  • Risk management and safety consulting
  • Due diligence services

Technical and economic definitions and comparisons of large turnkey deliveries, such as electrolysis, carbon capture, and e-fuels.

Modern industrial facility with "P2X Solutions" signage and green storage tank.

2. Design and Engineering Services

2. Design and Engineering Services

With design and engineering services, we turn the concept into a concrete plan that can be implemented efficiently and safely.

  • Implementation design for all engineering disciplines
  • 3D modeling and layouts
  • Material and process specifications
  • Automation and electrical design
  • Technical specifications for procurements
  • Safety engineering design
A silhouette of a battery-shaped object with a lightning bolt cutout in the center is placed on a wooden surface. The sun is setting in the background, and its rays shine through the lightning bolt cutout, creating a starburst effect

3. Project Services and Construction Management

3. Project Services and Construction Management

With project services and construction management, we handle the project proficiently to stay on schedule and within budget.

  • Project management and scheduling
  • Site services and supervision
  • Cost monitoring and procurement services
  • Documentation and owner’s advocacy
  • Safety and design collaboration
A construction worker wearing a yellow high-visibility jacket with the logo and text "SWECO" on the back, along with a hard hat, is pointing towards something in the distance. Another person in similar attire is partially visible on the right side of the image.

4. Production Support and Development

4. Production Support and Development

Production support and development ensure that the production operates optimally and adapts to future needs.

  • Data and documentation management
  • Digital solutions and monitoring
  • Safety training and audits
  • Bottleneck removal and production improvements
  • Maintenance support and small modernization
Four people are gathered around a table in a meeting room. Three of them are sitting while one person is standing, leaning forward with hands on the table. There are papers, pens, and coffee mugs on the table.

The Core of P2X Projects: Safety, Technology, and Regulation

P2X solutions combine multiple energy and process technologies where safety and regulation play a central role. Sweco has extensive experience in demanding industrial and energy infrastructure projects, where technological expertise and safety are foundational for all planning.

We help our clients ensure that the chosen technologies support the project’s goals. We ensure that the project meets all national and EU-level requirements, including environmental impact assessment (EIA), technical safety regulations, and permitting processes.

  • Technology assessments and comparisons: We evaluate the suitability of different technological solutions for the project and compare alternatives from technical, economic, and regulatory perspectives.
  • Environmental permitting and government collaboration: We manage the entire environmental permitting and government process from preliminary assessments to review rounds.
  • Safety planning and auditing: Comprehensive risk assessments and technical safety are part of Sweco’s design process.
  • Due Diligence: We identify sustainability-related risks and opportunities before the project begins.

A P2X Project Succeeds When the Whole System Works

P2X projects are multi-phase and technically challenging projects where aligning various systems, stakeholders, and requirements is crucial.

Sweco acts as an integrator for our clients, ensuring that technical solutions, permitting, scheduling, and business logic come together seamlessly.

We lead the whole process, anticipate risks, and enable the project to become not only feasible but also profitable and scalable.

Sweco as the Lead Designer in Finland’s First Industrial P2X Plant

Harjavalta’s green hydrogen project is a pioneer for domestic e-fuel production – read more.

 

A P2X Project Succeeds When the Whole System Works

P2X projects are multi-phase and technically challenging projects where aligning various systems, stakeholders, and requirements is crucial.

Sweco acts as an integrator for our clients, ensuring that technical solutions, permitting, scheduling, and business logic come together seamlessly.

We lead the whole process, anticipate risks, and enable the project to become not only feasible but also profitable and scalable.

Sweco as the Lead Designer in Finland’s First Industrial P2X Plant

Harjavalta’s green hydrogen project is a pioneer for domestic e-fuel production – read more.

 

Modern industrial facility with large tanks; P2X Solutions logo on green and gray building under cloudy sky.

Erkki Härö

Energy expert, industry

Tomas Norrena

Hydrogen Business Lead

Please don´t hesitate to contact our experts!

  • This field is for validation purposes and should be left unchanged.